In the designing stage of MKS heat shrinkable tube, thermodynamics and the law of heat conduction theories are taken into consideration by the designers.
j******b
MKS shrink tube has passed the following tests that are conducted by the third-party organization: lifecycle testing, biocompatibility testing, durability testing, and chemical resistance testing.
y******v
All components of MKS heat shrinkable tube are CNC machined and finished by hand and all structures produced are fully certified to global structural safety codes.
h******q
Before the MKS heat shrinkable tube is stored or shipped, the finishing operations and inspection remain to be performed following curing. The finishing operation trims flash or excess rubber.
y******t
Advanced inspection measures are used in the production of MKS shrink tube, such as coordinate measuring machine, gauges, roughness tester, and hardness tester.
y******n
To meet customer's expectation and the industry standard, the product has to be subjected to strict quality inspection before shipment.